Our team of experienced experts will help you complete construction at the best price and make sure your project stays on track. With experienced staff members and expertise in construction management and construction cost estimating, we manage our clients’ construction costs at all design stages and for all construction disciplines.

Northwestern NITMB Interior Renovation

This project will take 20,000 rentable square feet for the creation of the new National Institute for Theory and Mathematics in Biology (NITMB). This institute will create a nationwide collaborative research community that will generate new mathematical results and more. The work includes an ample presentation space, interaction spaces, catering support space, meeting rooms, reception, […]

UIC Computer Research Design and Learning Facility

The new four-story, 135,000 GSF building to be primarily occupied by the University’s Computer Science department will include 16,000 SF of classroom space, an undergraduate learning and community center, dry labs, a robotics lab, flexible event space, 21 faculty research laboratories, collaborative learning and teaching spaces, and features a geothermal farm to assist with sustainable […]

UIUC Demirjian Park

This $8.4M project constructed new soccer and track-and-field facilities on the University of Illinois at Urbana-Champaign campus. The new Demirjian Park features two soccer fields—one for competition and one for practice—located east of the track and field complex, which was also renovated. The stadium includes facilities for women’s soccer, men’s track and field, and women’s […]

UIUC Altgeld & Illini Hall

This project will completely restore the exterior and interior of Altgeld Hall (76,500 GSF), the second-oldest building on campus and listed on the National Register of Historic Places, to a world-class academic enterprise while preserving the building’s historical integrity. Significant exterior renovations will take place, including the removal of all (2,026) exterior windows at both […]

UIUC Everitt Laboratory 2nd Floor Lab Renovation

As part of a Retainer Work Order, this project will provide a state-of-the-art BSL-2 wet lab in the existing shell space in Room 2148 of Everitt Lab, a three-story, semi-flexible building, with bench space to accommodate 63 students and enclosed storage rooms for equipment and supplies. A carbon dioxide manifold system will be installed in […]

UIUC FICE HVAC and Roof Replacement

‘- This $10M project constructed a new 40,000 SF community center on North Market Street in Champaign, IL. The new building will provide community members with opportunities to meet, play, and learn under one roof, thanks to its state-of-the-art facilities. The new building includes a gymnasium, a studio, an “innovation center”, a fitness center, administrative […]

UIUC Altgeld & Illini Hall

This project will completely restore both the exterior and interior of Altgeld Hall (76,500 GSF), the second-oldest building on campus and listed on the National Register of Historic Places, to a world-class academic enterprise while maintaining the historical integrity of the structure. Significant exterior renovations will take place, including the removal of all (2,026) exterior […]

UIUC Krannert Art Museum & Kinkead Pavilion Renovations

This project provided for select interior renovations to The Krannert Art Museum Kinkead Pavilion, including the replacement of MEP equipment, upgrades to fire and security systems, and interior wall and ceiling finishes. In addition, exterior renovations included a new outside air damper, building envelope repair, and replacement of windows and glazing, including their associated blocking […]

Engineering Science Building Chilled Water Expansion

This project will replace the existing once-through use of potable/domestic cooling water with a closed-loop chilled-water heat-rejection system for laboratories within the Engineering Science Building. The targeted areas will be the basement, first and second floors of the low-rise, and the basement and first floors of the 6-story high-rise.

UIUC Noyes Lab, Smith Hall, and Stock Pavilion Roof Replacements

This project will install new, highly insulated roofing at multiple buildings on campus that have exceeded their life expectancy and are a regular maintenance issue. The new roofs will have improved levels of insulation to meet current energy conservation codes and will reduce leaks and water infiltration. Work includes replacing the roof and insulation, raising […]